Your System Powers Up Complete

Real timelines. Zero guesswork. Here’s exactly what happens—from install through your first year.

We Respond Fast 2 business days maximum.

Most enquiries get a response within 24 hours. Speed matters when you’re ready to go

97% Right First Time Complete & fully functional on day one.

No second visits. No waiting for follow-up work. 23,109+

Performance Guarantee System generates within 10% of projection in Year 1.

If not, we investigate and remediate at no cost. We stand behind our design.

3-Month Daily Monitoring

We watch your system every single day for the first 3 months. If anything’s off, we investigate and fix immediately at no cost.

Full Insurance Coverage $20M public liability + $10M professional indemnity.

Every installation is fully protected from start to finish.

What your team can do

We dont just quote a solar system, every journey starts with a full home energy audit, so what you install actually fits your whole home uses power.

Solar PV Design

SAA-accredited system design. Grid- connected expertise. Sizing optimization for your home.

Battery Systems

Battery installation, integration, and commissioning. Inverter setup and optimization.

Electrical Work

Licensed electricians. Switchboard modification. AS/NZS 3000 compliance.

Testing & Certification

Licensed Electrical Inspectors. COES certification. Full verification before handover.

Customer Handover

App setup and demonstration. Maintenance guidance. System operation training.

Standards Compliance

AS/NZS 3000, AS 4777, AS/NZS 5033. Work Health & Safety Act 2011 compliance.

Before your install

We clarify every detail before work begins. No surprises, no changes mid-installation.

Thorough Review

We go through installation details and
system design with you. Any questions
or concerns are clarified before work
begins.

Schedule Locked

Installation dates are confirmed and
final. We do not reschedule unless
unforeseen circumstances arise—and
we notify you immediately if that
happens.

LEI Ready

We arrange a Licensed Electrical
Inspector (LEI) to be available within 2
business days of completion to obtain
your Certificate of Electrical Safety
(COES).

Your Pre-Installation Checklist

Clear Roof Access

Remove antenna cables, satellite dishes, or loose items.

Clear the Driveway

We need parking for work vehicle and equipment truck.

Confirm Indoor Access

Switchboard and battery locations must be accessible.

Arrange Pets & Kids

Installation is active work. Plan for supervised areas.

Have Documents Ready

We'll need to collect SUNRISE Satisfaction Form, STC Assignment Form, Solar VIC documents on installation day.

Installation Day – What Happens

Site Inspection

We arrive and conduct final walkthrough. Any site-specific changes are discussed and require your approval before work begins.

Roof & Electrical Work

Licensed electricians work to strict WHS standards (Work Health & Safety Act 2011). Safety harnesses, fall protection, safety rails. Full compliance with AS/NZS 3000, AS 4777, AS/NZS 5033.

Testing & Verification

Before handover: earth continuity checks, insulation resistance, circuit breaker response, battery inverter output, monitoring connectivity. Everything verified to spec.

Inverter App Setup

We set up the monitoring app on your device, demonstrate real-time performance tracking, explain maintenance schedules, start-up and
shut-down procedures.

Forms & Documentation

We collect SUNRISE Satisfaction Form, STC Assignment Form, Solar VIC documents. Physical forms provided to SUNRISE within 24 hours of installation.

Site Cleanup

We clean as we go throughout the day. By end of install, your property is swept, debris removed, cable runs tidied. Any property damage is fixed immediately at no cost.

Power Interruption

Your power will be off 20–30 minutes when we switch from grid-only to grid-connected mode. Fridges and freezers are unaffected. Plan accordingly.

After Installation

The work doesn’t stop at handover. We monitor your system daily for the first 3 months and ensure everything is certified and protected.

Post-Installation Timeline

Within 2 Business Days

Licensed Electrical Inspector (LEI) appointed to conduct testing and obtain Certificate of Electrical Safety (COES).

Within 10 Business Days

COES delivered to us along with panel serial numbers, inverter serial numbers, and installation photos. We submit for STC and grid connection.

First 3 Months

We monitor system performance daily to ensure it’s generating as projected. If anything is unusual, we investigate and remediate immediately at no cost.

Ongoing

We keep complete records of your installation for 7 years. Your system is tracked, monitored, and we proactively reach out if we spot performance issues.

You'll Receive

Certificate of Electrical Safety

COES provided within 10 business
days, signed by Licensed Electrical
Inspector.

Warranty Documentation

Full warranty coverage: 10 years
panels, 10 years battery, 5 years
labour. All documented and explained.

App Access & Guide

Performance monitoring app login,
setup guide, and support contacts for
24/7 assistance.

We Close the Loop

Sustainability doesn’t end at installation. We recycle old equipment responsibly, track your carbon offset (25+ year environmental impact), and stay connected to your system’s future.

97% Right The First Time

We design, install, test, and commission systems so thoroughly that 97% are complete and fully functional on day one.

First-Year Performance Guarantee

We don't just install right. We guarantee you generate right.

If your system doesn’t generate within 10% of our projection in the first 12 months, we investigate and remediate at no cost. We model your generation down to the day—if real-world output is below projection, we find why and fix it.

When Things Aren’t Perfect (3% of the time)

Faulty Component

Component fails testing. We replace on day one or next day at no cost.

Switchboard Issue

Unexpected switchboard fault found. Electrician called same-day, fix within 48 hours, free.

Configuration Tweak

Inverter firmware update or settings adjustment needed. Handled remotely or 30-minute visit, free.

Everything costs you nothing. All covered under warranty. Return visits always free.

Before you get a quote

How fast do you respond to enquiries?

We commit to responding within 2 business days. Most enquiries get a response within 24 hours. Speed matters when you're ready to go solar—we don't leave you waiting.

Typically 20-30 minutes. This happens when we switch your switchboard from grid-only to grid-connected mode. We do this at a predetermined time during install day. Fridges, freezers, and heating systems are unaffected.

Yes. You need to be home to grant access, answer questions, and sign off on final testing and app setup. A family member can be present if you prefer.

We solve it on the spot. If testing finds something unexpected, we fix it immediately. If it requires component replacement or a return visit (rare), it's covered under warranty at no cost.

On installation day, after testing. Once we've verified everything works and you've signed off, your system is live. You'll see generation in your monitoring app within minutes.

When do I get my Certificate of Electrical Safety?

Within 10 business days of installation. We appoint a Licensed Electrical Inspector (LEI) within 2 business days to conduct testing. The COES is then provided within 10 business days along with all system documentation.

Solar Panels: 10 years (materials & workmanship)
Battery Storage: 10 years (capacity guarantee & materials)
Inverter: 5-10 years (varies by brand)
Labour: 5 years (installation quality). Return visits are always free.
What's NOT covered: Accidental damage, customer-moved equipment, natural disasters (covered by home insurance).
Full Insurance: Every installation backed by Public Liability Insurance ($20M) and Professional Indemnity Insurance ($10M).

Urgent issues (no power, system won't start): 2-hour response, 24/7.
Non-urgent issues: 24-hour response, business hours.
Return visits: Always free within warranty. Scheduled within 48 hours.

We monitor your system performance month-on-month. If we spot unusual patterns, we reach out proactively.

All work complies with Australian standards including:

AS/NZS 3000: Wiring Rules (electrical installation)
AS 4777: Grid connection of energy systems via inverters
AS/NZS 5033: Installation of photovoltaic (PV) arrays
AS/NZS 1768: Lightning protection
Work Health & Safety Act 2011 (Vic)

All crew members are inducted for WHS compliance and maintain required Personal Protective Equipment (PPE).

Read our latest news and blogs

From system design and professional installation to energy storage, our smart solar solutions deliver reliable performance.